| Federal AirCav Gunship | ||||||
| item | cost | weight | sp. | avail. | DP | notes |
| body - small chopper | 20,000 | 800 | 19 | |||
| powerplant - standard chopper | 20,000 | 3,500 | 13 | 6 | 26 | 14000 |
| pilot | 150 | 2 | 4 | |||
| universal 3-sp turret | 3500 | 300 | 2 | 2 | ||
| AutoCannon | 7250 | 600 | 2 | in turret | ||
| AC magazines x2 | 1600 | 230 | 2 | 0 | 2 | |
| 3-space EWP x2 | 4000 | 800 | L/R F | |||
| Rocket Launcher x2 | 2700 | 500 | 2 | in EWPs | ||
| RL mags x2 | 800 | 130 | 1 | in EWPs | ||
| EWP armor | 200 | 80 | 10pts each | |||
| Link - RL R/L | 50 | |||||
| TC pilot | 1000 | pilot | ||||
| rotor armor | 400 | 50 | 10pts on main | |||
| armor totals: | 1050 | 1050 | ||||
| front | 4 | |||||
| back | 4 | |||||
| right | 4 | |||||
| left | 4 | |||||
| top | 1 | |||||
| underbody | 4 | |||||
| vehicle totals: | 61500 | 7140 | ||||
| top speed: | 198.675496688742 |
| Federal AirCav Troopship | ||||||||
| item | cost | weight | sp | avail. | cargo | c-avail | DP | notes |
| body - standard chopper | 40,000 | 1,200 | 24 | 6 | ||||
| powerplant - small air | 15,000 | 3,000 | 10 | 14 | 6 | 8000 | ||
| PlatCats | 3,000 | 14 | 6 | 8400 | ||||
| pilot | 150 | 2 | 12 | 6 | ||||
| troops | 4400 | 1200 | 2 | 10 | 6 | 0 | AR & fatigues only | |
| extra side-door | 1000 | 500 | 10 | 1 on each side | ||||
| doorgunner x2 | 300 | 4 | 6 | |||||
| pintle mount x2 | 300 | 40 | 6 | |||||
| MachineGun x2 | 3000 | 400 | 6 | on pintle mounts | ||||
| 3-space EWP | 2000 | 300 | 6 | U F | ||||
| Rocket Launcher | 1350 | 250 | 6 | 2 | in EWPs | |||
| RL mag | 400 | 65 | 6 | 1 | ||||
| EWP armor | 100 | 40 | 6 | 10pts | ||||
| SWC/RL | 500 | 6 | pilot | |||||
| armor totals: | 500 | 500 | 6 | |||||
| front | 2 | |||||||
| back | 1 | |||||||
| right | 2 | |||||||
| left | 2 | |||||||
| top | 1 | |||||||
| underbody | 2 | |||||||
| vehicle totals: | 71550 | 7945 | ||||||
| top speed: | 154.175588865096 | |||||||
| 4 transport choppers | 286200 | |||||||
| 1 gunship | 61500 | |||||||
| total outlay | 347700 | |||||||
| scenario budget | 350000 | |||||||
| remaining | 2300 |